Dock Permit Survey: G3 Engineering & Surveying determines the critical line, existing structures, and edges of waterways to meet every requirement following the guidelines of SCDHEC-OCRM to obtain a dock permit. Before beginning a dock, bulkhead, boat ramp or other alteration, G3 performs a Critical Line Survey and completes the permit process. In addition to a required survey for structural improvements, keep in mind that over time the critical line can change. Receiving an updated survey is important for purchasing, building upon, improving, or selling property located near a waterway.
Swimming Pool Installation Survey: G3 performs a field survey of the lot locating the existing structure, drives, walks, and other above ground improvements to the property and prepares a plat conforming to the Standards of Practice Manual for Surveying in South Carolina and applicable County for use of a real estate closing and/or obtaining a pool permit.
We continue to work alongside leading marine construction companies, real estate agencies, and law firms to provide clients with precision and consistency in the surveying and permitting process.
PO Box 2666, Pawleys Island, SC 29585
24 Commerce Drive, Pawleys Island, SC 29585
200 Whitsett St., Suite C, Greenville, SC, 29601